We develop the RetroMe image generator in four clearly defined phases:
Phase 1: Concept and strategy
The goal: to design a user experience that is as simple and intuitive as possible - while generating the best possible image. By defining clear prompts and parameters in advance, we ensure that users do not have to make any decisions later - but can immerse themselves in the retro look directly by uploading their image.
Phase 2: Proof of concept
We test local open source image models and set up the basic backend. The main goals are to test the image generation and collect feedback from early users to optimize usability.
Phase 3: Going live
After the initial tests, we launch the live version of the generator. This initially poses technical challenges, as many employees want to access the generator at the same time. We therefore increase the server capacity to cope with the high user load.
Phase 4: Maintenance
In the final phase, we focus on stabilizing and optimizing the application. The infrastructure is improved and optimized to ensure consistent availability and further refine the digital experience for all users.